Ericsson 2G (DUG) Integration ~ Communication World © كيفية جعل شكل التدوينات مربعة في البلوجر المصدر: https://www.mo3awin.com/2019/03/grid-layout-for-blogger.html

(Communication World (Ericsson / Huawei / Siae / Transmission Courses and Jobs

الجمعة، 23 ديسمبر 2016

Ericsson 2G (DUG) Integration

How to Integrate 2G cabinet (Ericsson ) in case Indoor
Cabinet (RBS 6201)


     
First connect on the cabinet (DUG) on port LMTA using
 USB to RJ cable
and then adjust the COM port on the OMT
:Then follow the following steps in order

  • Create IDB
     - Cabinet setup -- New
             - 
      -Antenna sector setup -- New
    -RE setup
  • Define Node Parameters
Master DUG will be on Hub position : B1

others Digital units will be on : A5 , A6 , A7 , A2 , A3

  • Define RU position

  • Add all defined units to  present

  • Define Transmission
  • Install IDB
press on connect and put DUG on local mode to can install IDB
on it.
then press on install 

Then after installation remove DUG from local mode
The final Design 
Only RUS 01 B8 for every sector with 4 carriers

The following Video illustrate all steps on alive DUG



The following Video illustrate How to download OMT 65



To inquire or ask about anything that is unclear question here please and will be answered soon 

Thanks .
Share:

0 التعليقات:

Hosam Hassan. يتم التشغيل بواسطة Blogger.

Blog Archive

Blog Archive